Prefilled Gabion Temporary Barrier Wall, A9 at Drumochter

As part of a large masonry contract, JML Gabions delivered a design, supply and install solution for a temporary barrier wall up to 2m in height for BEAR Scotland on the A9 dual carriageway at the Pass of Drumochter. 

Two large, failed masonry sidings required taken down and rebuilt on the south bound carriageway of the A9. Due to safety concerns, the take down works were from MEWP, with the stones being caught by the temporary prefilled gabion barrier, to allow the A9 to remain open. 

JML Gabions completed all the calculations and required engineering for the barrier, supplied and installed the 6mm heavy-duty prefilled gabion barrier for the duration of the works.

The prefilled gabion units were quick and easy to deploy and were able to deal easily with large stones, masonry and falling debris throughout the take-down works. 

Prefilled gabions were delivered by flatbed and lifted directly into position by an on- site excavator

  • Client: Bear Scotland

CHALLENGES

Two large, failed masonry sidings required taken down and rebuilt on the south bound carriageway of the A9. Due to safety concerns, the take down works were from MEWP, with the stones being caught by the temporary prefilled gabion barrier, to allow the A9 to remain open. 

SERVICES DELIVERED

Removal of unsafe masonry walling by MEWP (12m high) with a single lane closure on the A9 dual carriageway. Design, supply and installation of a prefilled temporary barrier

Other Projects

If you would like to discuss your project, please get-in-touch.

To comply with data protection regulations (2018), we are unable to store and use your information unless you give us your permission. Please select Yes to allow this and rest assured we will never pass your details on to a 3rd party. View our data protection policy for details.*

If you would like to discuss your project, please

GET IN TOUCH