The client engaged JML Gabions to provide engineering support and the supply of 6mm heavy-duty gabion baskets for use as temporary bridge abutments for HGV access to a Scottish Water site. The project required a practical and economical temporary abutment solution capable of supporting HGV loading while maintaining programme efficiency. Our 6mm heavy-duty, prefilled gabion units were the ideal choice.
The prefilled gabion abutments were installed to support two temporary bridges, with a maximum span of 25m, allowing HGV traffic to safely cross the site during the construction phase. The solution provided a robust, flexible and efficient temporary works system capable of accommodating heavy vehicle loading while reducing construction time and simplifying removal at the end of the project.
Following completion of the temporary works phase, the bridges and gabion abutments were dismantled and removed from their temporary positions. The gabion baskets were inspected, and the prefilled units were reused elsewhere on the site, providing a sustainable and cost-effective outcome, reducing waste and adding value to the overall project
Value-engineered temporary works solution, 6mm prefilled heavy-duty gabion system, safe bridge bearing support, temporary access infrastructure, rapid installation and removal.