JML Contracts delivered a design, supply and install contract for Fife Council at Dalgety Bay, replacing a failed 100-metre-long concrete retaining wall. With programme constraints and restricted site access, JML implemented an efficient off-site solution using prefilled gabion baskets, enabling rapid installation. The replacement wall reached heights of up to 3.5 metres and was installed and backfilled within five days.
Challenging ground conditions limited access for wheeled plant, so gabion units were delivered to the nearest hardstanding, offloaded and tracked into position using an excavator. This approach removed the need for a temporary haul road, reduced site congestion and delivered a cost-effective solution with minimal disruption.
Removal of failed concrete retaining wall, design, supply and install of prefilled gabion retaining wall.