JML Contracts was appointed by Cairn Housing Association as Principal Contractor to design, supply and install an extensive riverbank restoration and erosion protection scheme along Annick Water, following the failure of sections of the existing riverbank and gabion protection. The works involved restoring the failed bank profile and installing a new erosion protection system using approximately 1,200 two-tonne, double-skin rock bags across four separate zones.
Working within and alongside the watercourse required careful planning and extensive temporary works. These included 31m of sheet piling, a temporary working platform and a river crossing to provide access to the south bank. Specialist fish rescue and invasive species management were also incorporated into the programme, alongside water management and silt control measures to protect the surrounding environment.
The project required close liaison with local residents and coordination with Scottish Water in relation to an existing culvert and associated surface water outfall.
Collapsed trees, failed gabions and debris were removed before the riverbank was excavated and reprofiled to the required design. The rock bags were prefilled with stone in a designated area on site before being lifted directly into position. This allowed the installation to progress efficiently, reducing the amount of material handling and filling operations required within the river corridor.
The works also included reinstatement of the surface water outfall associated with the Scottish Water culvert, together with topsoiling, fencing and associated site restoration. The project demonstrates JML Contracts' ability to manage and deliver complex riverbank restoration and erosion protection works, combining specialist civil engineering, temporary works, environmental management and efficient on-site profiling and installation techniques to provide a practical solution in a challenging river environment.
The project required close liaison with local residents and coordination with Scottish Water in relation to an existing culvert and associated surface water outfall.
Collapsed trees, failed gabions and debris were removed before the riverbank was excavated and reprofiled to the required design. The rock bags were prefilled with stone in a designated area on site before being lifted directly into position. This allowed the installation to progress efficiently, reducing the amount of material handling and filling operations required within the river corridor
Riverbank restoration and reprofiling, temporary sheet piling, temporary river crossing and access platform, removal of failed gabions and debris, prefilling and installation of 1,186 two-tonne double-skin rock bags, water management and silt control, environmental protection, surface water outfall reinstatement and site restoration.