JML Gabions carried out all civils works associated with this flood-damaged stone wall and embankment in Perthshire. Rather than simply rebuilding the existing stone wall, which would not have addressed the underlying drainage issues, JML worked closely with the engineers and estate to develop a more
robust long-term solution.
The failed retaining wall was replaced with prefilled gabions, the slipped embankment was reprofiled and pre-seeded erosion control matting with fixing pins was installed. Additional works included close-boarded fencing together with culvert and drainage repairs beneath the road.
Utilising prefilled gabions provided a quicker, safer and less disruptive solution, minimising the duration of the required temporary road closure and traffic management measures.
Banking and stone wall reinstatement, retaining wall, fencing, erosion control