Envirolok Soil Retaining Wall, Aberdeenshire

JML Contracts carried out the design, supply and installation of an engineered sandbag retaining wall in Aberdeenshire for an ESN mast site. The boundaries of the site meant that an innovative and reduced section solution was required, which still had to meet the required design criteria set by the client. JML utilised the Envirolok system from the USA with short grid tails and some soil nails which allowed for a reduced section. The bags were filled at JML’s premises using a graded mixture of gravels and pre-seeded soil. This offsite approach meant that the site works were reduced to only a few days

  • Client: EE / Huawei

SERVICES DELIVERED

Design, supply & installation of an envirolok sandbag wall for ESN mast compound

Other Projects

If you would like to discuss your project, please get-in-touch.

To comply with data protection regulations (2018), we are unable to store and use your information unless you give us your permission. Please select Yes to allow this and rest assured we will never pass your details on to a 3rd party. View our data protection policy for details.*

If you would like to discuss your project, please

GET IN TOUCH