JML Gabions was appointed as the specialist gabion contractor to supply and install a new 6mm heavy-duty prefilled gabion retaining wall at Whitecraig Road Park in Newburgh, Fife.
The new wall was constructed in front of an existing 5–6m high stone retaining wall which had become compromised. With a children’s play area below, a narrow public road above and the railway nearby, access and site logistics were particularly challenging. All works had to be carried out from the lower ground level, with a large crane used to lift a 20-tonne excavator onto the upper working platform.
With very limited space for storage, JML’s prefilled gabions were manufactured and filled off site, then delivered on a carefully coordinated basis and lifted directly into position. This significantly reduced installation time, on-site labour, storage and double handling. With fewer operations taking place within the restricted working area, it also improved site safety and minimised disruption to the surrounding community.
The completed wall provides a robust, long-term retaining solution and is a great example of where prefilled gabions really come into their own on complex, restricted-access sites.
With a children’s play area below, a narrow public road above and the railway nearby, access and site logistics were particularly challenging. All works had to be carried out from the lower ground level, with a large crane used to lift a 20-tonne excavator onto the upper working platform.
6mm heavy-duty prefilled gabion retaining wall, temporary works, restricted-access operations, groundworks and complex lifting & logistics.