JML Gabions supported Perth & Kinross Council (PKC) in the installation of both prefilled and in-situ gabions as part of a major project in Glen Lyon. The retaining wall, reaching heights of up to 5 metres in places, was constructed in phased sections to minimise exposure of the road and adjacent banking.
Where excavated ground conditions were particularly poor, JML utilised prefilled gabions to accelerate installation, and increase saftey, reducing the risk of slippage and limiting prolonged exposure of excavations to adverse weather.
The gabion structure was backfilled and compacted using 6F2 material, with fence post sleeves integrated into the top layer to accommodate the new fencing
Where excavated ground conditions were particularly poor, JML utilised prefilled gabions to accelerate installation, and increase saftey, reducing the risk of slippage and limiting prolonged exposure of excavations to adverse weather.
Supply and install of prefilled and in-situ gabion retaining wall to support road